Rooftop Patio Renovation on State St., South Loop, Chicago
- Location
- South Loop, Chicago
- Project Type
- Outdoor / Exterior
- Scope
- Rooftop Patio Renovation
About This Outdoor Project
A rooftop patio renovation on State St. in the South Loop. In a downtown building the roof is often the only outdoor space available, and building on it properly means resolving structure, drainage and waterproofing before any of the visible surface goes down.
Drainage is the detail that decides whether a rooftop deck lasts. Water still has to reach the roof’s own outlets with a new surface in place, and that requirement shapes the build-up, the falls and how the whole deck is supported.

Project Photos
Services Behind This Project
Planning something similar?
Tell us about your space and what you want to change. We will set up a consultation and come back with a scope, a schedule and a price.
Outdoor Renovation FAQs
What is involved in a rooftop patio renovation?
More than the surface. Structural capacity, drainage, waterproofing and how the deck ties into the roof assembly all have to be right before anything visible goes down. Getting those wrong is expensive, so they are assessed before any design work.
Does rooftop or exterior work need a permit?
Usually, particularly where structure, decking, railings or roof penetrations are involved. Requirements vary between the city and each suburb, so we confirm the specific path for your address before finalising the design rather than after.
What affects material choice for outdoor work in Chicago?
Freeze and thaw cycles, wind exposure and sun, more than anything. Materials that perform well in a milder climate do not always survive here. We select for what the location actually does to the material over years, not just for appearance on day one.
Can you work with the existing roof or deck structure?
Sometimes, and where the structure is sound that is the more economical route. Whether it can carry the intended load is a structural question rather than a preference, so it gets evaluated properly before we plan around keeping it.
When is the best time of year for exterior work?
The warmer months, because most exterior coatings, sealants and mortars have minimum temperature requirements to cure correctly. Planning and approvals can happen over winter so the build starts as soon as conditions allow.
Other Projects
Paulina St., Wicker Park — Rooftop Patio
Rooftop Patio Renovation & Gazebo Installation
View project