About This Whole-Home Project
A complete home remodel on Denberry Dr. in Lake Zurich. Working on a detached suburban house gives more room to change the plan than a city unit does — walls, circulation and how the main floor connects are all genuinely on the table when the whole house is in scope.
A whole-house remodel is sequenced rather than assembled: structure first, then services, then close-up, then finishes room by room. Planning that order properly at the start is what keeps a project of this size from stalling halfway through.

Project Photos
Services Behind This Project
Planning something similar?
Tell us about your space and what you want to change. We will set up a consultation and come back with a scope, a schedule and a price.
Whole-Home Renovation FAQs
What does a complete unit renovation include?
Typically kitchen, bathrooms, flooring and paint throughout, along with the carpentry, tile and any plumbing and electrical the work exposes. Every project differs, so scope is agreed room by room before pricing rather than assumed from a package.
Can we live in the property during a full renovation?
Generally not, and we will say so plainly rather than let you find out mid-project. A whole-unit renovation touches every room and the mechanical systems, so most clients arrange to be out. Phased approaches are possible on larger homes where a wing can be sealed off.
How is a project like this sequenced?
Demolition, then anything structural, then rough plumbing and electrical, inspections where required, then closing walls, then finishes in order from the top down. The sequence is not flexible, which is why a realistic schedule matters more than an optimistic one.
Do you handle permits?
Where the scope requires them, yes. Structural changes and most plumbing, electrical and mechanical work need permits, while cosmetic updates generally do not. We identify what applies before pricing and build the approval time into the schedule.
How do you keep a whole-home project on track?
One team runs both the design and the build, so there is no gap between what was drawn and what gets constructed. Long-lead items are ordered early, and the trades are scheduled against one programme rather than each managing their own.
Other Projects
State St., Downtown
Complete Unit Renovation & Popcorn Ceiling Removal
View projectState St., South Loop — Kitchen & Unit
Complete Kitchen & Unit Renovation
View project