Bathroom Remodeling in Edgewater, Chicago

In a Sheridan Road tower the bathroom is bounded by a concrete slab; in Edgewater Glen it is bounded by 1915 plumbing. We rebuild both properly, and the waterproofing matters more than anything you can see.

Licensed, Bonded & Insured  ·  Serving Edgewater and the surrounding area

In Short

A full bathroom remodel in Edgewater typically runs $25,000 to $40,000 and a primary suite $44,000 to $75,000, taking four to seven weeks on site. Permits come from the Chicago Department of Buildings, with board approval alongside in the towers and the converted buildings. The single most important thing in either half of the neighbourhood is a tested waterproofing membrane — with a neighbour directly below, it is the failure that costs the most.

Main bathroom
$25k – $40k
Primary suite
$44k – $75k+
Time on site
4 – 7 weeks
Permits issued by
Chicago Dept. of Buildings
Bathroom Remodeling

What an Edgewater bathroom remodel actually involves

The bathroom in a 1970s Sheridan Road tower sits on a structural concrete slab with a fixed riser. Nothing is cut into the floor, so the toilet stays where the building put it and the room is transformed through the vanity, the shower and the storage instead.

A few blocks west, in a frame house in Edgewater Glen, the bathroom is a 1915 room carved out of a bedroom, with galvanised supply, a cast-iron stack and a floor that has moved. There the drain can move, but the plumbing behind it usually has to be replaced first.

What both halves share is waterproofing. In a tower and in a two-flat alike there is someone directly below, and a shower built without a tested membrane is the one mistake that becomes a genuinely expensive problem.

Bathroom Remodeling project by Revive 360 Renovations in Edgewater
A recent bathroom remodeling project. Edgewater and the surrounding area.
Your House

Find your building, and you will find your project

Edgewater is two neighbourhoods wearing one name, and the bathroom project differs in kind.

Era and building typeWhat we find on siteWhat the project becomesTypical range
1960s–1975 — Sheridan Road towers A structural slab, a fixed riser, builder-grade fittings at the end of their life, and a board to satisfy. Finish replacement with the waterproofing done properly and the fixtures kept where the slab dictates. $23k – $35k
1920s — grand buildings near Bryn Mawr A larger bathroom, high ceilings, original tile in a mortar bed and services altered by earlier conversions. Full gut with the floor build-up rebuilt and the services traced back to something sound. $30k – $42k
1905–1925 — frame houses in Edgewater Glen A bath carved out of a bedroom, galvanised supply, a cast-iron stack and a floor that has moved. Gut with new supply and waste, the floor levelled and rebuilt, and a genuine replan because the drain can move. $28k – $40k
1910–1930 — two-flats and courtyard buildings A bath off a rear hall, a shared stack, shallow joists and a board where converted. Gut in place. The toilet stays on the branch and the room is won back with a vanity and a walk-in shower. $25k – $36k
On Site

What is specific to remodelling here

These are the conditions that decide the schedule and the contingency on a job in Edgewater. We price around them rather than discovering them.

A structural slab in the towers

Nothing is chased into it. A relocated fixture means a raised floor build-up rather than a new run in concrete, so the toilet stays close to where the building placed it.

Waterproofing, and the neighbour below

A tested membrane before a single tile. A bathroom last done in the 1990s frequently has none, and in a stacked building that is the failure that matters. It is why the floor comes up even on a finish-level project.

Board approval and insurance

In the towers and the converted courtyard buildings the association approves the scope, wants your working hours and a certificate naming them. It usually sets the start date.

Galvanised supply in the frame houses

West of Broadway the houses are wood-frame and often still on galvanised steel, with a cast-iron stack in the wall. Pressure fails long before the pipe looks bad.

Ventilation into a shaft

Bathrooms with no window vent into a light well or the ceiling void more often than not. A proper duct to outside air takes planning in a masonry building and is what keeps the grout clean.

Freight lifts and back stairs

A tub, tile and a vanity arrive through a booked freight lift in a tower and up the back stairs in a two-flat. Either way the route and the window are part of the schedule.

Budget

What drives the number in Edgewater

Ranges, not a single number. Where a project lands depends on the scope, and we say which band we think you are in before you commit to anything.

Refresh, same layout

$15,000 – $24,000

Fixtures, tile, vanity, lighting and paint with every service staying put — viable only where the existing waterproofing is sound, which we check before recommending it.

Full remodel, revised layout

$25,000 – $40,000

To the studs and subfloor, supply replaced where needed, a tub-to-shower conversion, a rebuilt floor with a tested membrane and extraction ducted outside.

Primary suite

$44,000 – $75,000+

Space taken from an adjoining room, a double vanity, a glassed shower and heated floor. More achievable in the larger 1920s buildings and the frame houses than in a tower.

Where It Goes

Where the money actually goes

Most of a bathroom budget is not the things you can see in a showroom. This is how a full remodel here divides up.

  • Labour and project management 34%
  • Tile, stone and waterproofing 18%
  • Plumbing rough-in and fixtures 16%
  • Vanity, storage and counters 12%
  • Electrical, lighting and ventilation 8%
  • Glass, doors and hardware 7%
  • Permits, protection and disposal 5%

Based on a $32,000 full remodel, the midpoint of what we actually build here. Waterproofing takes a bigger share here than the percentage suggests. In a stacked building it is the one line where saving money costs the most.

Process

How the job runs

Consultation on site

We walk the room, look at the basement ceiling below it and at the stack, and tell you what we can see and what we cannot.

Scope, drawings and a fixed price

A written scope with allowances you can actually shop against, not a single number.

Permit filed for you

Submitted to the Chicago Department of Buildings. We prepare and lodge it; you will not be at the counter.

Demolition and the rough-in

Plumbing, electrical and framing inspected before anything is closed. This is where surprises surface, and where we come back to you if the price has to move.

Waterproofing and tile

A tested waterproofing membrane before a single tile goes down. This is the step that decides whether the room lasts twenty years or five.

Finish, snag and final inspection

Fixtures, glass, paint and a walk-through list that we close out before the final invoice.

Planning a bathroom remodeling project in Edgewater?

Tell us about the property and what you want to change. We will walk the space, look at what is behind the walls, and come back with a written scope, a schedule and a price.

FAQ

Bathroom Remodeling in Edgewater: Common Questions

How much does a bathroom remodel cost in Edgewater?

A main bathroom rebuilt to the studs generally lands between $25,000 and $40,000, and a primary suite starts around $44,000. A refresh that keeps the services in place runs $15,000 to $24,000 — but only where the existing waterproofing is sound.

I live in a tower. Can the bathroom layout change?

Within limits. The slab is structural so nothing is cut into it, which means the toilet stays close to where the building placed it. A vanity, a shower and the storage have real freedom, and in practice that is where a tower bathroom is transformed.

Our shower has been leaking into the unit below.

Almost always the waterproofing. Showers built in the 1990s frequently have no tested membrane behind the tile, so water tracks through the substrate. It has to be stripped back and rebuilt properly rather than re-tiled, which is why we open the floor even on a finish-level project.

What does the association need?

A written scope, the working hours we will keep, and a certificate of insurance naming the association. We provide all three. In the towers and the converted buildings it is usually the item that sets your start date, so file it as soon as the scope is settled.

Our frame house has low water pressure. Why?

Almost certainly galvanised steel supply, which corrodes from the inside so the pipe looks fine while the bore closes up. We price replacement back to the nearest accessible branch as standard rather than treating it as a variation.

My bathroom has no window. What about ventilation?

It needs a fan ducted to outside air, not into a light well or a ceiling void, which is what we most often find. In a masonry building the route takes planning, and getting it right is the difference between a bathroom that dries out and one that grows mould in the grout.

How long will the bathroom be out of use?

Four to seven weeks on site, plus whatever the board takes to approve it. In a one-bathroom unit we sequence the work to keep the gap as short as possible.

Which other neighbourhoods do you cover?

Edgewater sits between Rogers Park and Uptown, and those two along with West Ridge and Lincoln Square are regular ground for the same crews.

Our website uses cookies to enhance your browsing experience and provide personalized content and ads. By clicking “Accept”, you’re agreeing to let us use cookies that help our website function smoothly. Without these cookies, some features of our website might not work. Click “Accept” and get ready to explore.

Get your quote today

Our services are tailored to make your dream come true.

ADDRESS

2837 N Halsted St, Chicago, IL 60657

CONTACT INFO

info@reviverenovations.com

Office: (773) 345-6358