Bathroom Remodeling in Irving Park, Chicago

Irving Park houses are big enough that a proper primary suite usually fits inside the existing walls. That is rare on the North Side, and it is the project most people here should be considering.

Licensed, Bonded & Insured  ·  Serving Irving Park and the surrounding area

In Short

A full bathroom remodel in Irving Park typically runs $27,000 to $42,000 and a primary suite $48,000 to $84,000, taking five to eight weeks on site. Permits come from the Chicago Department of Buildings, with Commission review for exterior work in the landmark districts. Generous plans mean combining a small bathroom with an adjoining bedroom or a large hall is genuinely achievable, which is what separates this neighbourhood from the flats to the east.

Main bathroom
$27k – $42k
Primary suite
$48k – $84k+
Time on site
5 – 8 weeks
Permits issued by
Chicago Dept. of Buildings
Bathroom Remodeling

What an Irving Park bathroom remodel actually involves

A Victorian or Foursquare in Irving Park was built with one substantial bathroom and, in the larger houses, a second small one. Both are original in size: the fixtures have changed, the footprint has not.

Behind the plaster is the full pre-war set — galvanised supply, a cast-iron stack, wiring from several eras, and floors that have moved over a century.

What these houses have that their neighbours do not is room. A bathroom and an adjoining bedroom, or a bathroom and an oversized landing, combine into a proper suite without extending. That is the most requested project here and it is usually a structural question rather than a plumbing one.

Bathroom Remodeling project by Revive 360 Renovations in Irving Park
A recent bathroom remodeling project. Irving Park and the surrounding area.
Your House

Find your house, and you will find your project

Irving Park has the space for the suite most North Side houses cannot fit.

Era and building typeWhat we find on siteWhat the project becomesTypical range
1880–1900 — frame Victorians and Queen Annes One substantial bathroom and sometimes a small second, galvanised supply, a cast-iron stack, plaster on lath and floors that have moved. Full gut, floor levelled, services replaced, and usually combined with an adjoining room for a proper suite. $34k – $42k
1907–1922 — Villa District Craftsman and Foursquares A well-built original bathroom with tile in a mortar bed and joinery worth keeping. Gut inside the existing walls with the detailing retained and the waterproofing done properly. $30k – $40k
1910–1930 — brick bungalows The 5×7 bungalow bath: tub in an alcove, pedestal basin, one side window, no storage. Gut with twelve inches won back for a real vanity and the tub converted to a walk-in shower. $26k – $36k
1950–present — infill and rebuilds Copper supply, a roomier bathroom, and finishes that have dated. Layout usually stays; a double vanity and a level-access shower fit without structural work. $24k – $38k
On Site

What is specific to remodelling here

These are the conditions that decide the schedule and the contingency on a job in Irving Park. We price around them rather than discovering them.

Combining rooms for a suite

The most requested project in the neighbourhood. Whether the wall between a bathroom and the room next door is carrying the floor above decides whether it is a day of framing or a sized beam with an engineer’s letter.

Galvanised supply and a cast-iron stack

Standard in houses never overhauled. The supply closes from the inside so pressure fails first; the stack is usually sound and stays, and where it is not the replacement runs through a finished wall below.

Victorian framing and floors that have moved

True dimensional lumber running one way, and a floor that is rarely level after a century. Both are dealt with before waterproofing, and the build-up eats into the fall available to a shower drain.

Knob-and-tube and mixed-era wiring

Anything we open comes to current code, and the bathroom gets a dedicated GFCI-protected circuit.

Landmark districts

Interior work is unaffected. A new window, a rooflight or an exterior vent on a house in the Villa District or Old Irving Park needs Commission review, started well before the build.

Pre-1978 lead paint rules

These houses are entirely pre-1978, so containment, HEPA filtration, a certified firm and documented cleanup are legal requirements in the programme from day one.

Budget

What drives the number in Irving Park

Ranges, not a single number. Where a project lands depends on the scope, and we say which band we think you are in before you commit to anything.

Refresh, same layout

$16,000 – $25,000

Fixtures, tile, vanity, lighting and paint with every service staying put.

Full remodel, revised layout

$27,000 – $42,000

To the studs and subfloor, new supply and waste, the floor levelled and rebuilt, a tub-to-shower conversion and a tested membrane.

Primary suite

$48,000 – $84,000+

Combining the bathroom with an adjoining room, a double vanity, a separate tub and glassed shower, heated floor and a structural opening.

Where It Goes

Where the money actually goes

Most of a bathroom budget is not the things you can see in a showroom. This is how a full remodel here divides up.

  • Labour and project management 34%
  • Tile, stone and waterproofing 18%
  • Plumbing rough-in and fixtures 16%
  • Vanity, storage and counters 12%
  • Electrical, lighting and ventilation 8%
  • Glass, doors and hardware 7%
  • Permits, protection and disposal 5%

Based on a $34,000 full remodel, the midpoint of what we actually build here. The labour share is higher than the city average, because a Victorian floor has to be levelled and the supply chased back through plaster before anything visible happens.

Process

How the job runs

Consultation on site

We walk the room, look at the basement ceiling below it and at the stack, and tell you what we can see and what we cannot.

Scope, drawings and a fixed price

A written scope with allowances you can actually shop against, not a single number.

Permit filed for you

Submitted to the Chicago Department of Buildings. We prepare and lodge it; you will not be at the counter.

Demolition and the rough-in

Plumbing, electrical and framing inspected before anything is closed. This is where surprises surface, and where we come back to you if the price has to move.

Waterproofing and tile

A tested waterproofing membrane before a single tile goes down. This is the step that decides whether the room lasts twenty years or five.

Finish, snag and final inspection

Fixtures, glass, paint and a walk-through list that we close out before the final invoice.

Planning a bathroom remodeling project in Irving Park?

Tell us about the property and what you want to change. We will walk the space, look at what is behind the walls, and come back with a written scope, a schedule and a price.

FAQ

Bathroom Remodeling in Irving Park: Common Questions

How much does a bathroom remodel cost in Irving Park?

A main bathroom rebuilt to the studs generally lands between $27,000 and $42,000, and a primary suite starts around $48,000. A refresh that keeps the services in place runs $16,000 to $25,000.

Can we get a primary suite without extending?

In most Irving Park houses, yes, and it is the most requested project here. The plans are generous enough that combining a bathroom with an adjoining bedroom or a large landing gives a proper suite inside the existing walls. Whether that wall is carrying is answered with the ceiling open.

My house is in a landmark district. Does that affect the bathroom?

Not for interior work. The district concerns the exterior, so a bathroom rebuilt within its existing walls is unaffected. It engages only for a new window, a rooflight or an exterior vent, and that review should be started early.

Our floors are not level. Does that matter?

Yes, and it is normal in a house of this age. The floor is built back level before anything is waterproofed, and that build-up has to be allowed for in the fall to a new shower drain. It is better found on the first visit than with the tile on order.

We still have knob-and-tube wiring.

Common in houses never fully rewired. It is not an emergency, but anything we open comes to current code and the bathroom gets its own GFCI-protected circuit as part of the work.

Why is water pressure poor upstairs?

Almost always galvanised steel supply, which corrodes from the inside so the bore closes while the pipe looks fine. We price replacement back to the nearest accessible branch as standard rather than treating it as a variation.

Do you handle lead-safe work?

Yes, and here it is required. These houses are entirely pre-1978, so containment, HEPA filtration, a certified firm and documented cleanup are in the programme and the price from the start.

Which other neighbourhoods do you cover?

Irving Park sits beside Albany Park, North Center and Avondale, all regular ground for the same crews.

Our website uses cookies to enhance your browsing experience and provide personalized content and ads. By clicking “Accept”, you’re agreeing to let us use cookies that help our website function smoothly. Without these cookies, some features of our website might not work. Click “Accept” and get ready to explore.

Get your quote today

Our services are tailored to make your dream come true.

ADDRESS

2837 N Halsted St, Chicago, IL 60657

CONTACT INFO

info@reviverenovations.com

Office: (773) 345-6358