Services spliced by earlier subdivision
Where a large flat was split, the pipework serving the bathroom was joined up afterwards and often across several eras. Tracing it before quoting is the most useful hour we spend in this neighbourhood.
Licensed, Bonded & Insured · Serving Uptown and the surrounding area
A full bathroom remodel in Uptown typically runs $25,000 to $40,000 and a primary suite $44,000 to $76,000, taking four to seven weeks on site. Permits come from the Chicago Department of Buildings, with board approval alongside. The high ceilings that make Uptown kitchens easier help here too: there is room to build a floor up for a proper fall to a new shower drain without the room ending up low.
The bathroom in an Uptown courtyard building or walk-up is usually original: hexagon floor and subway walls set into a mortar bed, a cast-iron tub in an alcove, a pedestal basin, and often a window onto a light well. It was built in about 1925 and in a great many flats nobody has taken it back to the studs since.
Where the flat was subdivided, the services running past that bathroom are a patchwork. Where it was not, they are simply old. Either way the supply and the branch to the stack are the first things we look at.
The ceiling height is the quiet advantage. Building a floor up to get a proper fall to a new shower drain costs headroom, and in most Chicago housing there is none to spare. In Uptown there is, which is why a level-access shower is more often possible here.
How many times the flat has been divided matters more here than the year it was built.
| Era and building type | What we find on site | What the project becomes | Typical range |
|---|---|---|---|
| 1910–1930 — courtyard buildings, never divided | A generous bathroom with original tile in a mortar bed, high ceilings and coherent if elderly services. | Full gut with the floor rebuilt for a proper fall, a walk-in shower and a real vanity. | $30k – $40k |
| 1910–1930 — flats subdivided later | A narrow bathroom carved from something larger, with services spliced across eras and a floor that steps. | Trace and replace the services, level the floor, and replan within what the branch allows. | $28k – $38k |
| 1920s — vintage walk-ups | A stack shared with a handful of units, plaster on lath, and a window onto a light well. | Gut in place with extraction finally ducted to outside air and the waterproofing done properly. | $26k – $36k |
| 1890s — Sheridan Park frame and brick houses | A bath carved out of a bedroom, galvanised supply, a cast-iron stack and a basement below. | Gut with new supply and waste and a genuine replan, because the drain can move. | $28k – $40k |
These are the conditions that decide the schedule and the contingency on a job in Uptown. We price around them rather than discovering them.
Where a large flat was split, the pipework serving the bathroom was joined up afterwards and often across several eras. Tracing it before quoting is the most useful hour we spend in this neighbourhood.
The toilet stays on the branch that reaches the stack. Where that branch is original cast iron inside the floor, replacing it means opening the ceiling below — a conversation with a neighbour as much as a cost.
A proper fall to a new shower drain needs floor build-up. Eleven-foot ceilings mean losing two inches costs nothing you will notice, which is why level-access showers work here.
A written scope, working hours and a certificate naming the association. It is usually the item that sets your start date.
Many of these bathrooms vent into a light well or simply the ceiling void. A proper duct to outside air takes planning in a masonry building and is what keeps the grout clean.
The hexagon floor and the wall tile are bedded in mortar, not stuck to a board. Demolition is heavier and dustier, and the substrate has to be rebuilt before waterproofing.
Ranges, not a single number. Where a project lands depends on the scope, and we say which band we think you are in before you commit to anything.
Fixtures, tile, vanity, lighting and paint with every service staying put — viable only where the existing waterproofing is sound.
To the studs and subfloor, supply replaced, a tub-to-shower conversion, the floor rebuilt for a proper fall and a tested membrane.
Space taken from an adjoining room, a double vanity, a glassed shower and heated floor — more achievable in the larger undivided flats.
Most of a bathroom budget is not the things you can see in a showroom. This is how a full remodel here divides up.
Based on a $32,000 full remodel, the midpoint of what we actually build here. The plumbing share runs above the city average wherever a flat was subdivided, because the first job is replacing what earlier work spliced together.
We walk the room, look at the basement ceiling below it and at the stack, and tell you what we can see and what we cannot.
A written scope with allowances you can actually shop against, not a single number.
Submitted to the Chicago Department of Buildings. We prepare and lodge it; you will not be at the counter.
Plumbing, electrical and framing inspected before anything is closed. This is where surprises surface, and where we come back to you if the price has to move.
A tested waterproofing membrane before a single tile goes down. This is the step that decides whether the room lasts twenty years or five.
Fixtures, glass, paint and a walk-through list that we close out before the final invoice.
Tell us about the property and what you want to change. We will walk the space, look at what is behind the walls, and come back with a written scope, a schedule and a price.
A main bathroom taken to the studs and rebuilt generally lands between $25,000 and $40,000. A refresh that keeps every service in place runs $15,000 to $24,000. What moves the number most is the state of the supply and the branch to the stack.
More often in Uptown than in most of Chicago. A proper fall to the drain needs the floor built up, which costs headroom — and with eleven-foot ceilings you will not notice losing two inches. We confirm it with the floor open.
Usually only a short distance. The waste riser is shared and fixed, so the toilet stays on the branch that reaches it. A vanity and a shower have far more freedom, and that is where the room is actually won back.
Mostly that the services are a patchwork. Pipework was joined up after the split, often across three eras and materials, and it rarely follows the plan you would expect. We trace it before quoting rather than discovering it with the floor up.
Occasionally, if it is sound and complete. More often the mortar bed underneath has to come out to get a proper fall to a new shower drain, and the tile does not survive being lifted. Where the look matters we source a close modern match.
Yes, and it is common here. It moves the moisture a few feet rather than removing it. A proper duct to outside air takes planning in a masonry building, and it is the difference between a bathroom that dries out and one that grows mould in the grout.
A written scope, the working hours we will keep, and a certificate of insurance naming the association. We provide all three, and it is worth filing the moment the scope is settled.
Uptown sits between Edgewater and Lakeview, and those two along with Lincoln Square and Albany Park are regular ground for the same crews.