Bonded & Insured | Lic. TGC144723
North Center

Bathroom Remodeling in North Center, Chicago

In an original North Center cottage the bathroom is a century old. In a 2000s rebuild it is fifteen years old and the shower pan is already failing. Different rooms, different work.

Licensed, Bonded & Insured  ·  Serving North Center and the surrounding area

In Short

A full bathroom remodel in North Center typically runs $26,000 to $41,000 and a primary suite $46,000 to $80,000, taking four to seven weeks on site. Permits come from the Chicago Department of Buildings. The commonest finding in the newer houses is a shower pan formed without proper fall, which is why we open the floor even when the project began as a change of finish.

Main bathroom
$26k – $41k
Primary suite
$46k – $80k+
Time on site
4 – 7 weeks
Permits issued by
Chicago Dept. of Buildings
Bathroom Remodeling

What a North Center bathroom remodel actually involves

Two bathrooms exist side by side in this neighbourhood. In an original cottage or bungalow it is the Chicago standard: five by seven, tile in a mortar bed, a cast-iron tub in an alcove and galvanised supply behind the wall.

In a house from the rebuild boom it is a generous primary bath with a double vanity and a glassed shower — and, very often, a shower pan formed without enough fall and a fan that recirculates into a ceiling void.

Only one of those is a rescue job, and it is usually the newer one. A hundred-year-old bathroom is honest about its age. A fifteen-year-old one that looks fine can be moving water through the substrate, and that is the failure worth finding early.

Bathroom Remodeling project by Revive 360 Renovations in North Center
A recent bathroom remodeling project. North Center and the surrounding area.
Your House

Find your house, and you will find your project

In North Center a fifteen-year-old bathroom is more often the rescue job than a hundred-year-old one.

Era and building typeWhat we find on siteWhat the project becomesTypical range
1890–1915 — frame cottages, often raised A bath carved from leftover space, services spliced across eras, floor levels that step, galvanised supply. Gut with the services traced and replaced and the floor rebuilt level before anything is waterproofed. $30k – $41k
1915–1930 — bungalows and two-flats The 5×7 bath, tile in a mortar bed, cast-iron tub in an alcove, one window. Gut with the build-up rebuilt and a real vanity and shower won back in the same footprint. $26k – $36k
1998–2010 — the rebuild boom A generous primary bath, modern services, and a shower pan or membrane that was never done properly. Strip back to a sound substrate and rebuild the wet area properly. Often the whole project. $28k – $41k
2010–present — recent construction Sound framing and services, bathrooms already sized, finishes that have dated. Finish-level replacement with the floor still opened to confirm the waterproofing. $26k – $40k
On Site

What is specific to remodelling here

These are the conditions that decide the schedule and the contingency on a job in North Center. We price around them rather than discovering them.

Shower pans from the rebuild boom

The most common finding in a 2000s house. Formed without enough fall to the drain, or with a membrane that was never tested, so water tracks into the substrate. It is why we open the floor even on a finish-level project.

Galvanised supply in the original stock

A cottage or bungalow never re-piped is on galvanised steel, which closes from the inside so pressure fails before the pipe looks bad.

Cottages that were raised

Services spliced across eras and floor levels that step, both corrected before anything is tiled.

Extraction into a ceiling void

Common in both eras. The fan moves the moisture a few feet rather than removing it. A proper duct to outside air is planned in, not found later.

A bathroom over a garage or a void

In the taller newer houses a bathroom often sits over unheated space. Insulation and pipe routing are dealt with while the floor is open rather than after the first cold snap.

Pre-1978 rules in the original houses

Cottages and bungalows here predate 1978, so containment, HEPA filtration and a certified firm are legal requirements and sit in the schedule.

Budget

What drives the number in North Center

Ranges, not a single number. Where a project lands depends on the scope, and we say which band we think you are in before you commit to anything.

Refresh, same layout

$15,000 – $24,000

Fixtures, tile, vanity, lighting and paint with every service staying put — viable only where the waterproofing is sound, which we check first.

Full remodel, revised layout

$26,000 – $41,000

To the studs and subfloor, supply replaced where needed, a rebuilt floor with a tested membrane and extraction ducted outside.

Primary suite

$46,000 – $80,000+

Space taken from an adjoining room, a double vanity, a separate tub and glassed shower, and a heated floor.

Where It Goes

Where the money actually goes

Most of a bathroom budget is not the things you can see in a showroom. This is how a full remodel here divides up.

  • Labour and project management 34%
  • Tile, stone and waterproofing 18%
  • Plumbing rough-in and fixtures 16%
  • Vanity, storage and counters 12%
  • Electrical, lighting and ventilation 8%
  • Glass, doors and hardware 7%
  • Permits, protection and disposal 5%

Based on a $33,000 full remodel, the midpoint of what we actually build here. Waterproofing takes a larger share here than the percentage suggests, because in this neighbourhood it is most often the reason the project exists at all.

Process

How the job runs

Consultation on site

We walk the room, look at the basement ceiling below it and at the stack, and tell you what we can see and what we cannot.

Scope, drawings and a fixed price

A written scope with allowances you can actually shop against, not a single number.

Permit filed for you

Submitted to the Chicago Department of Buildings. We prepare and lodge it; you will not be at the counter.

Demolition and the rough-in

Plumbing, electrical and framing inspected before anything is closed. This is where surprises surface, and where we come back to you if the price has to move.

Waterproofing and tile

A tested waterproofing membrane before a single tile goes down. This is the step that decides whether the room lasts twenty years or five.

Finish, snag and final inspection

Fixtures, glass, paint and a walk-through list that we close out before the final invoice.

Planning a bathroom remodeling project in North Center?

Tell us about the property and what you want to change. We will walk the space, look at what is behind the walls, and come back with a written scope, a schedule and a price.

FAQ

Bathroom Remodeling in North Center: Common Questions

How much does a bathroom remodel cost in North Center?

A main bathroom rebuilt to the studs generally lands between $26,000 and $41,000, and a primary suite starts around $46,000. A refresh that keeps the services in place runs $15,000 to $24,000 — but only where the existing waterproofing is sound.

Our house is from 2006 and the shower is leaking.

Very common here, and almost always the pan or the membrane. Showers from the rebuild boom were frequently formed without enough fall to the drain or with a membrane that was never tested, so water moves through the substrate instead of out. It has to be stripped back and rebuilt rather than re-tiled.

Why open the floor if we only want new tile and a vanity?

Because in this neighbourhood the floor is where the problem usually is. A fifteen-year-old bathroom that looks fine can be moving water into the structure. Opening it adds a day and it is the difference between a cosmetic job and a repair that lasts.

Our cottage bathroom floor steps down from the hall.

The house was almost certainly raised over a new basement at some point, which left the floors out of one plane. It is built back level before anything is waterproofed, and that build-up has to be allowed for in the fall to a new shower drain.

Can you put a walk-in shower where the tub is?

Usually yes. The limits are the floor build-up needed for a proper fall and whether the drain can move within the joist bay. Both are confirmed with the floor open before a design is committed to.

Is my bathroom fan vented outside?

Frequently not, in both the old houses and the new ones. Fans get terminated into a ceiling void or an attic, which relocates the moisture rather than removing it. We check what the existing one does and run a proper duct.

Do you handle lead-safe work?

Yes, in the original cottages and bungalows, which predate 1978. Containment, HEPA filtration, a certified firm and documented cleanup are legal requirements and are priced and scheduled in.

Which other neighbourhoods do you cover?

North Center sits beside Roscoe Village, Lincoln Square, Irving Park and Lakeview, all regular ground for the same crews.

Our website uses cookies to enhance your browsing experience and provide personalized content and ads. By clicking “Accept”, you’re agreeing to let us use cookies that help our website function smoothly. Without these cookies, some features of our website might not work. Click “Accept” and get ready to explore.

Get your quote today

Our services are tailored to make your dream come true.

ADDRESS

2837 N Halsted St, Chicago, IL 60657

CONTACT INFO

info@reviverenovations.com

Office: (773) 345-6358